Diagram Codes
|
Code |
Description |
|
|
|
|
|
|
| |||
|
# |
Reallocation (GEMINI) |
| |||||||||
|
AB |
Attach and Berth Multiple Unit(s) |
| |||||||||
|
ABDB |
Attach and Berth then Detach and Berth. |
| |||||||||
|
AC |
Arrival Check |
| |||||||||
|
AFP |
Attach front portion to rear portion (in conjunction with RF) |
| |||||||||
|
AP |
Attach Portion |
| |||||||||
|
AP/PA |
Attach portion/portion attached |
| |||||||||
|
AP/PU |
Attach Portion/Prepare Unit |
| |||||||||
|
APDP |
Attach Portion/Detach Portion |
| |||||||||
|
APPA |
Attach Portion, Portion Attached. |
| |||||||||
|
APPD |
Attach Portion/Portion Detach |
| |||||||||
|
APTC |
Attach Portion and then leave combined unit secure in service |
| |||||||||
|
ASST |
Assist as required |
| |||||||||
|
ATTACH |
Attach |
| |||||||||
|
ATTTT |
Attach (Through Train) |
| |||||||||
|
B |
Berth Locomotive(s) or Multiple Unit(s) |
| |||||||||
|
BP |
Bombardier Prep |
| |||||||||
|
CAB |
Travel in front cab for route knowledge purposes |
| |||||||||
|
GET |
Chemical Emission Toilet (Planned Empty) |
| |||||||||
|
COMM |
Commercial Duties |
| |||||||||
|
CS |
Coach Shunt |
| |||||||||
|
DB |
Detach and Berth Locomotive(s) or Multiple unit(s) |
| |||||||||
|
DBS |
Detach and berth both (or three) portions |
| |||||||||
|
DC |
Departure Check |
| |||||||||
|
DETACH |
Detach |
| |||||||||
|
DETTT |
Detach (Through Train) |
| |||||||||
|
DFP |
Detach Front Portion |
| |||||||||
|
DFPTC |
Detach Front Portion & Trip Circuit |
| |||||||||
|
DPF |
Detach Portion at Front |
| |||||||||
|
DPTC |
Detach portion and leave secure in service |
| |||||||||
|
DRP |
Detach Rear Portion |
| |||||||||
|
DRPTC |
Detach Reapportion & Trip Circuit |
| |||||||||
|
DTCFP |
Detach and TC front portion |
| |||||||||
|
DTCMP |
Detach TC Middle Portion |
| |||||||||
|
DTCRP |
Detach and TC rear portion |
| |||||||||
|
DTCS |
Detach and leave both (or three) portions secure |
| |||||||||
|
DW |
Detach & Work |
| |||||||||
|
DWFP |
Detach and work front portion of train in service |
| |||||||||
|
DWMP |
Detach and work middle portrion of train in service |
| |||||||||
|
DWRP |
Detach and work rear portion of train in service |
| |||||||||
|
FP |
Front Portion |
| |||||||||
|
FUEL |
Fuel |
| |||||||||
|
HIRE |
Unit on Hire |
| |||||||||
|
M&G |
Meet & Greet |
| |||||||||
|
MP |
Middle Portion |
| |||||||||
|
NOTE |
Note for information purposes |
| |||||||||
|
PA |
Portion attached by another driver |
| |||||||||
|
PAF |
Portion Attached at Front |
| |||||||||
|
PAPD |
Portion Attached/Portion Detached |
| |||||||||
|
PASS |
Passenger ride |
| |||||||||
|
PATC |
Portion Attached, Trip Circuits |
| |||||||||
|
PB |
Prepare from Berth |
| |||||||||
|
PBTC |
Prepare from berth and then leave secure |
| |||||||||
|
PC |
Prepare Locomotive(s) or Multiple Unit(s) left secure in service |
| |||||||||
|
PCDP |
Prepare Circuits, Detach Portion |
| |||||||||
|
PCTC |
Partial prepare partial dispose |
| |||||||||
|
PD |
Portion detached by another driver |
| |||||||||
|
PDAP |
Portion Detached/Attach Portion |
| |||||||||
|
PDPA |
Portion Detached/Portion Attached |
| |||||||||
|
PDTC |
Portion Detached, Trip Circuits |
| |||||||||
|
PILOT |
Pilot |
| |||||||||
|
PILTD |
Piloted |
| |||||||||
|
PNB |
Physical Needs Break |
| |||||||||
|
PTDT |
Prepare Train/Door Test |
| |||||||||
|
PU |
Prepare Unit (from berth) |
| |||||||||
|
PU/AP |
Prepare unit/ attach portion |
| |||||||||
|
PUAP |
Prepare Unit & Attach Portion P |
| |||||||||
|
PUTC |
Prepare unit from berth and leave secure in service |
| |||||||||
|
REFRSH |
Route refresh in Cab |
| |||||||||
|
REL |
Relieved |
| |||||||||
|
RELD |
Relieve |
| |||||||||
|
RF |
Gain leading cab and work forward after portion attached to front by another drive | ||||||||||
|
RP |
Rear Portion |
| |||||||||
|
RSE/S |
Locomotive or Unit(s) shunting for Depot Engineer's requirements |
| |||||||||
|
RTC |
Relieve and Leave Secure |
| |||||||||
|
RW |
Relieve and Work |
| |||||||||
|
RWFP |
Relieve and Work Front Portion |
| |||||||||
|
RWMP |
Relieve and Work Middle Portion |
| |||||||||
|
RWRP |
Relieve and Work Rear Portion |
| |||||||||
|
SHUNT |
Shunt |
| |||||||||
|
SPARE |
Spare |
| |||||||||
|
SRL |
Shunt to release locomotive | ||||||||||
|
STABLD |
Stabled |
| |||||||||
|
STDBY |
Standby |
| |||||||||
|
TC |
Leave Locomotive(s) or Multiple Unit(s) secure in Service |
| |||||||||
|
TCFP |
Front portion partial dispose |
| |||||||||
|
TCMP |
TC Middle Portion |
| |||||||||
|
TCRP |
Rear portion partial dispose |
| |||||||||
|
TEST |
Test Unit |
| |||||||||
|
TRNG |
Training Unit |
| |||||||||
|
WAR |
Work as Required |
| |||||||||
